Guide
How to size an APFC panel
To size an APFC panel, multiply the load in kW by the difference between the tangents of the present and target power factor angles. The result is the capacitor kVAR needed. Round up to a standard bank, split it into stages that match how the load changes, and add detuned reactors if harmonics are present.
By Kulaina engineering team ·
The formula
Required kVAR = load (kW) × (tan φ₁ − tan φ₂)
Here φ₁ is the angle of your present power factor and φ₂ the angle of the target. For a power factor PF, tan φ = √(1 − PF²) ÷ PF.
A worked example
A plant draws 400 kW at a power factor of 0.78 and wants 0.99.
| Step | Value |
|---|---|
| tan φ₁ at 0.78 | 0.802 |
| tan φ₂ at 0.99 | 0.142 |
| Difference | 0.660 |
| Required kVAR (400 × 0.660) | 264 kVAR |
| Next standard bank | 300 kVAR |
Choosing the stages
The controller switches stages in and out to follow the load, so the smallest stage sets how finely it can correct. A 300 kVAR panel is often built as 1 × 25, 1 × 50 and 3 × 75 kVAR. If your load swings by small steps, use more, smaller stages.
When you need detuned reactors
VFDs, UPS systems, induction furnaces and other non-linear loads create harmonics. Harmonics can overload capacitors or cause resonance with the transformer. Detuned reactors, commonly 7% or 14%, protect the bank. A harmonic measurement during the site study tells you which you need.
Allow for growth and ageing
Add 10 to 20 percent if the load is expected to grow, and remember that capacitors lose capacity with age and heat.
For a quick estimate, try the kVAR calculator. Then send us your load data for a site-checked design.