Skip to content
KULAINAAUTOMATION
Menu

Product

MCC panels

An MCC panel, or motor control centre, groups the starters and protection for every motor on a production line in one place. Kulaina builds MCC panels with DOL, star-delta and VFD starters, PLC and SCADA-ready controls and fully draw-out options, so one feeder can be serviced while the rest of the line keeps running.

PCC and MCC panel built in the Kulaina factory

Specifications

MCC panels specifications
StartersDOL and star-delta
DrivesVariable frequency drives (VFD)
ControlsPLC and SCADA ready
ConstructionFixed or fully draw-out
StandardsIS 8623 / IEC 61439

Options

  • Intelligent motor protection with remote monitoring
  • Draw-out starter modules for each feeder
  • Interlocks and sequencing for conveyors and process lines

Where it is used

  • Process plants with many motors on one line
  • Pumping stations and water treatment plants
  • HVAC plant rooms in commercial buildings

Standards

IS 8623 · IEC 61439

From our shop floor

Recent MCC panels built at our Jaipur works.

  • MCC with a bank of variable frequency drives, contactors and terminal rows behind open doors
  • Stack of wired VFD starter modules in the factory
  • Open MCC section with VFDs, control transformer and control wiring
  • MCC control sections with louvres and starter indication
  • Long MCC lineup with louvred sections in the Kulaina factory
Inside a VFD-based MCC: drives, MCBs and terminal wiring

An MCC is only as good as its documentation. Every starter is labelled to the motor list and the drawings are handed over with the panel, so your maintenance team can trace a feeder without opening every door.

Frequently asked questions

What does PLC and SCADA ready mean?

The MCC is wired with terminals and signals so a PLC can start and stop the motors and a SCADA system can read their status, without rewiring the panel later.

When should I choose a draw-out MCC?

When the line cannot stop for maintenance. In a draw-out MCC each starter module slides out on its own, so a faulty feeder can be repaired or swapped while the others keep running.

Discuss your panel requirement

Send your single-line diagram, BOQ or tender reference. An engineer replies within one working day.

Have drawings or a tender? Use the full enquiry form.