Kulaina supplied power distribution and motor control panels for a continuous-process opal-glass plant in Jaipur, where furnace-critical loads cannot stop. The panels were built, tested and commissioned around the plant's shutdown window, and the site has run without panel-related unplanned stops since commissioning.
- Client
- Borosil Limited
- Sector
- Glass manufacturing
- Panel
- PCC panels
- Rating
- 2500 A PCC with MCC sections
- Timeline
- 6 weeks from order to commissioning
- Result
- No panel-related unplanned stops since commissioning
The challenge
A glass furnace runs around the clock. Any interruption to furnace-critical loads risks the melt, so the distribution system had to be replaced without disturbing production.
What we supplied
A Form 4 PCC feeding dedicated MCC sections for furnace blowers and conveyors, with draw-out feeders so individual circuits can be maintained live.
The result
The changeover was completed inside the planned shutdown window, and the plant has run without panel-related unplanned stops since.