Panels for auto component plants
Auto component plants combine precision CNC machines with welding lines, compressors and drives, all on one supply. Kulaina builds PCC, MCC and APFC panels for these plants with separate feeders for sensitive and heavy loads, detuned power factor correction for drive harmonics and draw-out feeders that can be serviced between shifts.
Risks we design for
Precision machines on a shared supply
CNC machines and robots trip or scrap parts when welding and large motors cause voltage dips. Giving sensitive and heavy loads their own feeders keeps those dips out of the machining cells.
Harmonics from drives and welders
VFDs, servo drives and welding sets distort the supply. Standard capacitor banks overheat in that environment, so power factor correction needs detuned reactors.
Loads that change shift by shift
Load swings between shifts and breaks pull power factor around. An APFC panel with enough small stages follows the load and avoids penalties. Where welders switch in fractions of a second, thyristor-switched stages are needed.
Recommended panels
Most auto component plants grow one line at a time. We leave spare feeder space and busbar capacity in the PCC, so the next line can be connected without replacing the panel.
Compliance notes
- Panels built to IS 8623 and IEC 61439
- Detuned APFC where drives and welders create harmonics
- Separate feeders for machining, welding and compressor loads
Frequently asked questions
Why do CNC machines trip when the welding line starts?
Large welding and motor loads cause short voltage dips on a shared feeder. Splitting sensitive and heavy loads onto separate feeders from the PCC keeps the dips away from the CNC machines.
Do auto component plants need a detuned APFC panel?
Usually, yes. Drives, servo systems and welding sets create harmonics that overload standard capacitors. A harmonic measurement during the site study confirms which detuning you need.
Discuss your panel requirement
Send your single-line diagram, BOQ or tender reference. An engineer replies within one working day.